6-10  Blasted Lot being cleared
6-10 Blasted Lot being cleared
6-17  Forms in the ground
6-17 Forms in the ground
7-9  First floor deck built
7-9 First floor deck built
7-12   Back wall up
7-12 Back wall up
7-22  Second floor walls up
7-22 Second floor walls up
7-28  Rafters up
7-28 Rafters up
8-14  Shingles on the roof
8-14 Shingles on the roof
9-5  All framed, including the porch
9-5 All framed, including the porch
9-22  Mostly finished
9-22 Mostly finished
9-30  Siding done and leachfield installed and covered with stone
9-30 Siding done and leachfield installed and covered with stone