FrontHistory
6-10 Blasted Lot being cleared
6-17 Forms in the ground
7-9 First floor deck built
7-12 Back wall up
7-22 Second floor walls up
7-28 Rafters up
8-14 Shingles on the roof
9-5 All framed, including the porch
9-22 Mostly finished
9-30 Siding done and leachfield installed and covered with stone
Built with
MyAlbum